I know governor Mike Mbuvi Sonko wants to employ the youth in good faith. But realistically this is not sustainable in the manner since they’ll get tired and the work becomes sloppy. The best way to rectify the problem is to invest in more technologies to help alleviate the growing pressures of the city which cannot be satisfied by the heavy manual workload.
When the Governor acquired that pothole patching machine it eliminated how long it would take to patch potholes from hours to just a few minutes now I’m offering another solution that would save the county lots of money if they acquire a road brick laying machine. This will help in rebuilding nonexistent sidewalks and as well help in paving estate roads and the remaining money invested into drainage systems in the estates.
Take a look at the action of this amazing machine costing in the range of $81,000 to $100,000 and it can lay down at least 300 square meters (3,229 sq.ft.) of road per day. The machine needs two people to operate and make it functional and It’s powered electrically and has very little moving parts, therefore, the noise and maintenance are quite less.