[ATTACH=full]68611[/ATTACH]
Huyu contractor ni meffi
[ATTACH=full]68612[/ATTACH] [ATTACH=full]68613[/ATTACH]
@spear
How much longer do we have to wait for the SGR?
[ATTACH=full]68614[/ATTACH] [ATTACH=full]68615[/ATTACH]
Naskia contractor is chinese ama ni mchinku bonoko
The other day when i was coming from cumming, nilifika Makinon saa tisa usiku, but arrived in Msa at Noon. That strectch between makinon and Taru is chieth tupu.
[ATTACH=full]68616[/ATTACH]
That monday morning[ATTACH=full]68617[/ATTACH]
Today it’s it’s worse coz of the heavy downpour
@Meria Mata who are we blaming here? The rains,the rainmaker,the contractor or the project owner?
That road should be privatised with toll stations all the way…
Meffi is an understatement.
Baboun
Naona watu watumie ngamia waache makelele.
Btw hapo nikunoma hata ukiwa na usingizi gani ukifika hapo mpaka uamke
I went through there last weekend and it was really bad. Saloon cars were wading in water almost up to a metre deep. Not driving to msa anytime soon.
Mbona MAN hulemewa na matope hivo? No traction at all, na niko na 3 months Sijaguza hio mtambo, nikutafte nipate squad?
I
have some friends going to nai just now, niwaambie atulie hapa for a while?
Tutoe lock
Wachana kaguu kama Chifu Kivoi
why has this section taken more than a year to complete? Last year a time like this it was the same sorry state, with travellers getting stranded for days. Who is the Meffi contractor, China Wu Yi?