Jubilee Development - Ongoing expansion of the Rironi to James Gichuru road from 2 lane dual to three lanes dual road

Apart from 3 lanes dual road, the road includes motorcycle path and walk ways on both sides. It has several footbridges, acceleration lanes and interchanges. Pictures from skyscrapercity Kenya forum
[ATTACH=full]235650[/ATTACH][ATTACH=full]235651[/ATTACH][ATTACH=full]235652[/ATTACH][ATTACH=full]235653[/ATTACH][ATTACH=full]235654[/ATTACH][ATTACH=full]235655[/ATTACH][ATTACH=full]235656[/ATTACH][ATTACH=full]235657[/ATTACH][ATTACH=full]235658[/ATTACH][ATTACH=full]235659[/ATTACH][ATTACH=full]235660[/ATTACH]

Wazii

Are you Chinese? Looking at captions at the bottom right of your photos

Cost?design ya hapo ABC itakua aje linking to red Hill

Kshs 20 billion built by China Wu Yi. The interchange will be decided by KeNHa after meeting both CCCC and China Wu Yi. That’s the point where both contractors meet at their respective projects. At ABC place the elevated road might start there up to westlands where an underpass up to Nyayo stadium might be built. Its my speculation but I know CCCC 51 billion Nairobi express road funded by them will include a free dual public road upgrade and an express tolled 3 lane road highway. It might seem complicated but to then its very simple and its something they have perfected to build for decades now.

Wait for properties to skyrocket now

That will be a very long underpass, I don’t know how they will pull it off.

Ukana renders

Chupilee government is a failure, period. Hata wakijenga staircase to heaven they are still a failure

No. However CCCC said clearly, the designs are complete, bill of quantities done and now its just getting the various regulatory approvals from KeNHA, Nema and public participation before works starts in Dec 2019. They actually stated its an overpass and underpass is sections. The current free dual road will be upgraded while an three lane express tolled road will built. Even the useless BRT corridor will be done, though I would have preferred a commuter train. All for 51 billion of their own money. Let it be built, at least all their profit margin from SGR build is invested here.

Afadhali Moi, right? Baboons!

These projects were supposed to have been done by 2000.

No better thief. This are purely mois brainchildren. I stealing in the name of the Lord,“lord development”.

These photos are from Skyscapercity and there is a user there by the name Laotze , he always seems to have insider info .

Hiyo handle mimi hushuku ni propaganda army ya Xi Jing Ping. Go to the other African country pages, whenever kuna a Chinese project, utampata na the most upto date images and insider info

This is the road with the least information ever.
Even before Thika road construction started, we already knew where every overpass and underpass will be, the number of lanes, the length etc.
This road does not even have renders?