Jubilee Dev - Tarmacking of Waiyaki Way - Redhill Link Road is 66% complete

Sections of the Waiyaki Way-Red Hill Link Road that is currently under construction. he progress is 66 per cent and it is slowly taking shape @UKenyatta @JamesMacharia_ @MikeSonko @WilliamsRuto

https://t.co/yPn1AN98zv
[ATTACH=full]156018[/ATTACH] [ATTACH=full]156019[/ATTACH] [ATTACH=full]156020[/ATTACH] [ATTACH=full]156021[/ATTACH]

great

Nipewe hii barabara usiku naeza furahi sana

Uhuru ruto tano tena thumps up to the dynamic duo

This cant be Chinese - the pace has been super-slow!
Wamekaa now almost 3yrs

Its Chinese and the best so far, China Wu Yi. The excavation works was huge since they had to dig up hills to make it flat. Its no wonder its called Redhill. The bridges and culverts where huge.
[ATTACH=full]156029[/ATTACH] [ATTACH=full]156030[/ATTACH] [ATTACH=full]156031[/ATTACH] [ATTACH=full]156032[/ATTACH] [ATTACH=full]156033[/ATTACH] [ATTACH=full]156034[/ATTACH] [ATTACH=full]156035[/ATTACH]

Do have expected timeline for completion.

Another 12 months maximum.

*thumbs-up

Lakini hawajaanza tarmarking side ya Waiyaki way to spring valley. or they started from the redhill side? i passed there on my way to Kyuna this week na vumbi ndio mingi.

Why could they not do an underpass/proper interchange at Waiyaki way junction?

Our world is transforming as we watch in awe. Kudos to the progressive leadership.

China Wu Yi always does a good job not like that shit Sinohydro that did Outer ring road.

Only worry is that some of the designs on the roads are making them non functional. Look at the entries and exits to the new outering road (eastern bypass and thika highway), thika highway at the eastern bypass junction… they keep designing funnels

singular: kinohydro
plural :Sinohydro

:smiley: …hata hii ni maendeleo

Change the color of your handle…
:D:D:D:p

Because that proposed interchange is along Rironi-Westlands-Uhuru Highway-JKIA elevated highway project. It has been split into 3 phases. Phase 3 Rironi to James Gichuru is ongoing by the same contractor. It ends exactly the same place as this road. KeNHA will decide the type of interchange that will be built here not KURA. So let’s await Phase 2 James Gichuru to Uhuru Highway to Likoni Road elevated road award to know further details.

I was soo worried about this, if it was a normal T junction then we would have created a disaster

Lovely work @spear
Nangoja ABC junction