Different equipments come in at different stages of the build. From tomorrow its site clearance so only earth movers are needed and they will be parked at the site office. The rest go back to their secured warehouse in industrial area until needed. Now if everything remains the same, expect a few fibre cables to be cut for being in the wrong unmarked place, sewerage and water lines. At least Kenya power is moving its power lines.
Ubaya ya Jap is that they are too polite so they will plead with those car yards to move. China man atakuja na AP’s with earthmovers roaring. Within a few hours the business owners have moved everything not pinned down.
Until you get down to the real work on the ground.
I always challenge any willing person to walk, or drive slowly on the service lanes (where they exist) on Outer Ring road.
Did we really have to spend all that money on such a shoddy road.
If it must be shoddy, at least let us have the consolation that we did it ourselves.
H.E @UKenyatta also received construction equipment (10 single drum rollers and 2 soil stabilizers) donated by the Japanese Government through the Japanese aid for economic & social devpt. programme. The machines are a great boost to the local road construction sector.