Jubilee Dev - President Uhuru commissions Phase 1 dualling Ngong Road Nairobi

[MEDIA=twitter]976805003255009280[/MEDIA]

[ATTACH=full]163605[/ATTACH][ATTACH=full]163606[/ATTACH][ATTACH=full]163607[/ATTACH][ATTACH=full]163608[/ATTACH][ATTACH=full]163611[/ATTACH][ATTACH=full]163612[/ATTACH][ATTACH=full]163613[/ATTACH][ATTACH=full]163615[/ATTACH][ATTACH=full]163616[/ATTACH]

President Uhuru also launched the construction of phase 2-Ring Road yaya-Prestige-Dagoretti corner.

[ATTACH=full]163617[/ATTACH][ATTACH=full]163618[/ATTACH][ATTACH=full]163619[/ATTACH][ATTACH=full]163620[/ATTACH][ATTACH=full]163621[/ATTACH][ATTACH=full]163622[/ATTACH]

I thought equipment ilikuwa ibaki hapo kazi ianze, by now ishatolewa

Different equipments come in at different stages of the build. From tomorrow its site clearance so only earth movers are needed and they will be parked at the site office. The rest go back to their secured warehouse in industrial area until needed. Now if everything remains the same, expect a few fibre cables to be cut for being in the wrong unmarked place, sewerage and water lines. At least Kenya power is moving its power lines.

Uhuru is addicted to launching projects. What a waste of money and resources.

Tano tenor :D:D:D

Figsed :smiley:

Ubaya ya Jap is that they are too polite so they will plead with those car yards to move. China man atakuja na AP’s with earthmovers roaring. Within a few hours the business owners have moved everything not pinned down.

Uzuri ni hakuna permanent buildings kwa hio road reserve

Enyewe from those aerial shots one can see that we have a beautiful metropolis.

Building of roads is a waste of money according to your @Common Sense ?

Body guard wa uhuru anakuanga na body guard?

The aerial shots are just awesome. if only the whole of Nairobi had such planning.

Until you get down to the real work on the ground.
I always challenge any willing person to walk, or drive slowly on the service lanes (where they exist) on Outer Ring road.
Did we really have to spend all that money on such a shoddy road.
If it must be shoddy, at least let us have the consolation that we did it ourselves.

Learn how to read. I meant that the launching of projects with all that fanfare, venue is a waste not the road itself

Phase 1 road markings are already fading? Where is this cheap paint sourced?

H.E @UKenyatta also received construction equipment (10 single drum rollers and 2 soil stabilizers) donated by the Japanese Government through the Japanese aid for economic & social devpt. programme. The machines are a great boost to the local road construction sector.

https://t.co/uYnVs7x1ld

[ATTACH=full]163722[/ATTACH][ATTACH=full]163723[/ATTACH][ATTACH=full]163724[/ATTACH]

You must be referring to the ADC?

I wish these guys were given all CBD, Westlands and Upper Hill roads to maintain.

You do not need to pay attention to these sad spirits who send nuthing but doom and gloom

Flattening those plastic makeshifts should have been part of the road project (*sic)