No.
Specifically most of the places where the vehicle slow down.They look like never ending rubble strips.
ngong matatus use that road
However No bus stops
I broke my carās virgunity there.
Nani aliunda hiyo barabara, mchina ama mjapani?
He doesnāt want to admit it, ndivyo usiombe kaziā¦
Agreedā¦driving to Thika is always a helluva processā¦i curse alot.
I love how the Ngong road has changed. I drive to work in Karen daily along the road via Valley road daily and the roundabout is quite beautiful. What I realizd with these Japanese is that they did a slow but sure job. As one approaches Karen from Racecourse, kazi ya uchimbaji imeanza. Hecko
Yap from corner to Karen looks like ground works has began, hope its the same Japanese who built the other stretch will work there, because there work is beautiful n splendid,
Japanese : GRANT AID PROJECT FROM THE GOVERNMENT OF JAPAN
Grant Amount JPY 2.54 Billion
Target Road Section Total Length 8.36km
Missing Link No.3:Kileleshwa Police Stationļ½Westlands Roundabout(1.76km)
Missing Link No.6:Oloitokitok Roadļ½Kileleshwa Police Station(2.85km)
Missing Link No.7:James Gichuru Roadļ½Ngong Road(3.75km)
Contractor NIPPO CORPORATION
Consultant KATAHIRA AND ENGINEERS INTERNATIONAL
[ATTACH=full]149830[/ATTACH]
Outering road is worse. Japanese wapewe roads za CBD na Upper Hill watengeneze.
One project i am sure everyone regrets being awarded to the Nigerians is the Nairobi Eastern Missing Links.This guys have taken forever infact Outering Road is almost done while the bloody Nigerians have not completed Likoni Road Extension which is less than 3 Kilometres ( From Airtel HQ to Enterprise road)
This guys are the slowest of them all .Here is a screen grab from skyscrapercity indicating the timelines and the lengths of the roads to be done some of which are very important to ease of traffic flow.
http://www.skyscrapercity.com/showthread.php?t=1851960&highlight=rcc
[ATTACH=full]149835[/ATTACH]
Outering road is already aging (If thatās the right term to use) Over the weekend I drove from Donholm headed to Jogoo road and already in one of the express lanes the metal rail barrier has already been knocked off aside, sagging and the concrete posts supporting the metal barrier have already been uprooted. Some parts of the road are incomplete yet it looks like the road is now fully operational. Give the time it took to construct the road, this is not acceptable.
That was how the Northern bypass felt right after it opened. The linear settlers are on their way, with kiosks, bodabodas, unauthorized U-turns, garbage heaps and smoke.
the design loads used were uniform for all road sections instead of having a factor of safety where vehicles slow down like at bumps since they exert more pressure on the road than when speeding
when do we expect construction to begin?
Its been pending for a year now, so I canāt say when exactly.
Corner-Karen-Karen road is fully funded GoK. It was tendered and a Chinese firm won.